Work

Work you
can check.

Four projects, all our own, so you can open every one without asking us for a reference.

Two of them you can check tonight. Install Kickgeist from the App Store or Google Play, or read the container images' source and re-run the pull count.

There is client work too. An NDA covers it, so it is not ours to publish, and yours would be covered the same way.

Four debriefs, dated.

Each one states the problem, the approach, the result, and what it cost.

Since August 2015

Docker images: 14,970,732 pulls since 2015.

five public container repositories on GitHub

14,970,732pulls, measured 6 Aug 2026

  • Publishes 31 images across five public repositories
  • Rebuilds them daily at 10:00, 12:00 and 15:00 UTC
  • Runs Hadolint, Container Structure Tests, Docker Scout, Cosign signing, SBOM and provenance

Anyone can open these on GitHub and count the pulls for themselves. Tags are CalVer dates that stay published; docker-base runs the full gate set on five platforms.

Read the debrief
Dec 2025 to Jul 2026

One World Cup, operated live.

a prediction game on iOS, Android and web

863,000predictions submitted, measured 29 Jun 2026

  • Shipped one codebase to three platforms in 29 languages
  • Operated it live through the tournament
  • Migrated the database before the global launch

Signup is joining a group, so the invite loop is structural rather than bolted on. The app talks to Postgres directly, with row-level security as the authorisation boundary across 25 tables, 51 functions and 48 policies.

Read the debrief
Kickgeist on a phone: five prediction groups in a list, each a monogram tile with a name and a member count, over a button that creates another.
Kickgeist on a phone, one group opened: tabs for overview, predictions, rankings and challenges, then the group's total points, average accuracy and predictions made, and its members beneath.
The group loop, on the phone it ships on.

One mail. No form.

Tell us what is in the way.

Say what you're building and where it stopped.

hello@beevelop.com

Copy it into your mail client if that is easier.

The draft opens with

  1. What you are building
  2. What is in the way
  3. The stack
  4. When you want to start

The contact page says who answers, and what the reply contains.

What procurement will ask.